m (Text replacement - "Discuss Contract Custom Solution" to "Discuss Contract Custom Solution") |
|||
Line 14: | Line 14: | ||
[[Link::m:CO11]] | [[Link::m:CO11]] | ||
[[Link::m:CO111]] | [[Link::m:CO111]] | ||
− | [[Link::t: | + | [[Link::t:P2P]] |
[[Link::t:RL3]] | [[Link::t:RL3]] | ||
[[Link::t:RL5]] | [[Link::t:RL5]] |
The activities associated with verifying that the product or service delivered was according to the terms and conditions governing the purchase. This may include taking samples, sending samples to a laboratory, placing product in logical or physical quarantine (inventory blocks/holds), receiving test results and removing inventory blocks/holds.
Inspection may occur on all products on a delivery or on a sample.
The moment of inspection varies by use case, product, industry: Before unloading, after unloading, at time of Make consumption, upon completion of Make, etc. Typically most basic checks -such as: counting boxes and damage inspections- occur as part of the S103 process. Orders Defect Free Ratio Sourcing Cycle Time Cost of Goods Sold Direct Material Costs Plan-to-Produce Quality Control Return Warranty Return Quality Control Laboratory Information Management System
ID | Name | Level | x |
---|---|---|---|
DP12 | Orders Defect Free Ratio | 2 | DP12 |
RS14 | Sourcing Cycle Time | 2 | RS14 |
CO11 | Cost of Goods Sold | 2 | CO11 |
CO111 | Direct Material Costs | 3 | CO111 |
ID | Name | Clear | x |
---|---|---|---|
BOL | Bill of Lading | BOL | |
LIMS | Laboratory Information Management System | LIMS | |
QC | Quality Control | QC | |
RL3 | Quality Control Return | RL3 | |
S2P | Source-to-Pay | S2P | |
RL5 | Warranty Return | RL5 |
| Process |
| ||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
|
S104 |
|
||||||||||||||