m (Text replacement - "Discuss Contract Custom Solution" to "Discuss Contract Custom Solution") |
|||
(One intermediate revision by the same user not shown) | |||
Line 14: | Line 14: | ||
[[Link::m:AE1222]] | [[Link::m:AE1222]] | ||
[[Link::t:LIMS]] | [[Link::t:LIMS]] | ||
− | [[Link::t: | + | [[Link::t:P2P]] |
</ins> | </ins> | ||
{{Object | {{Object | ||
|name=Inspect | |name=Inspect | ||
|parent=sc:M1 | |parent=sc:M1 | ||
− | |sort= | + | |sort=5310400 |
|level=3 | |level=3 | ||
}} | }} | ||
[[Category:Supply Chain]] | [[Category:Supply Chain]] |
The activities associated with testing the output of a production process. This includes identifying the testing process, taking a sample of the material, transporting the sample or the material to the testing/inspection location, testing or inspecting the material, returning the material and publishing the test results. Product inspection may occur in-process, between stages or post production completion.
Orders Defect Free Ratio Make Cycle Time Work-in-Process Quality Control Return Days of WIP Inventory Work-in-Process Inventory - Restricted Laboratory Information Management System Plan-to-Produce
ID | Name | Level | x |
---|---|---|---|
DP12 | Orders Defect Free Ratio | 2 | DP12 |
RS13 | Make Cycle Time | 2 | RS13 |
AE122 | Days of WIP Inventory | 3 | AE122 |
AE1222 | Work-in-Process Inventory - Restricted | 4 | AE1222 |
ID | Name | Clear | x |
---|---|---|---|
LIMS | Laboratory Information Management System | LIMS | |
P2P | Plan-to-Produce | P2P | |
QC | Quality Control | QC | |
RL3 | Quality Control Return | RL3 | |
WIP | Work-in-Process | WIP |
| Process |
| ||||||||
---|---|---|---|---|---|---|---|---|---|---|
|
M104 |
|
||||||||