m |
m |
||
Line 2: | Line 2: | ||
===Calculation=== | ===Calculation=== | ||
{{math|{{this}}|[[m:AE31]] × [[m:AE32]] × [[m:AE33]]}} | {{math|{{this}}|[[m:AE31]] × [[m:AE32]] × [[m:AE33]]}} | ||
− | {{where|%|[[m:AE31]]|The percentage of time the equipment is ready and able to run, excluding planned and unplanned downtime.|[[m:AE32]]| | + | {{where|%|[[m:AE31]]|The percentage of time the equipment is ready and able to run, excluding planned and unplanned downtime.|[[m:AE32]]|The percentage of time the equipment is running at its maximum speed, without minor stops or slow cycles.|[[m:AE33]]|The percentage of good parts produced, excluding defects or rework. |
+ | }} | ||
===Importance=== | ===Importance=== | ||
An {{page}} approaching 100% means that: | An {{page}} approaching 100% means that: |
Overall Equipment Efficiency.
Overall Equipment Efficiency | |
= | Equipment Availability × Equipment Performance × Produced Quality |
An Discuss Contract Custom Solution approaching 100% means that:
ID | Name | Level | x |
---|---|---|---|
AE | Asset Efficiency | 0 | AE |
AE3 | Overall Equipment Efficiency | 1 | AE3 |
AE31 | Equipment Availability | 2 | AE31 |
AE32 | Equipment Performance | 2 | AE32 |
AE33 | Produced Quality | 2 | AE33 |