Actions

AE312

Difference between revisions of "AE312"

 
Line 1: Line 1:
{{this}} measures ..
+
{{this}} measures the percentage of planned production time during which the equipment is actually available for production.
 
===Calculation===
 
===Calculation===
 
{{math|{{this}} Ratio|{{frac|Ideal Cycle Time x Total Count|Run Time|100 %}}}}
 
{{math|{{this}} Ratio|{{frac|Ideal Cycle Time x Total Count|Run Time|100 %}}}}

Latest revision as of 13:25, 24 March 2025

Equipment Performance measures the percentage of planned production time during which the equipment is actually available for production.

Calculation

Equipment Performance Ratio
=
Ideal Cycle Time x Total Count   × 100 %
Run Time

where:

  • Ideal Cycle Time =
  • Total Count =
  • Run Time =

Unit of measure:

Importance

Notes

Community Importance Rating:
0.00
(0 votes)

Hierarchy

IDNameLevelx
AE31Overall Equipment Efficiency2AE31
AE312Equipment Performance3AE312
AE3121Velocity4AE3121
AE3122Utilization Rate4AE3122
Equipment Performance Overall Equipment Efficiency 53120 3 {{{keywords}}} {{{description}}}