The activities associated with the testing and verification of proposed network changes. This includes testing functional design and verification against business policies, objectives and other decision criteria.
Tools: Risk Scenario Testing, Environmental Impact Study, Simulation.
Hierarchy
ID | Name | Level | x | A2 | Align Network | 2 | A2 |
A211 | Validate To-Be Network Design | 3 | A211 |
Workflow
Note: Common inputs and outputs are listed in alphabetical order. Other inputs and outputs may be required to support varying use cases.Validate To-Be Network Design Align Network 2110 3 {{{keywords}}} {{{description}}}