Rework Required Rate measures the produced quantity graded as 'Rework required', as a percentage of total quantity produced.
Calculation
Rework Required Rate |
= |
Rework Quantity |
× 100 % |
Total Quantity |
|
where:
- Rework Quantity =
- Total Quantity =
Unit of measure: %
Importance
..
Notes
..
Community Importance
Rating:
Hierarchy
|
AE313 | Produced Quality | 3 | AE313 |
AE3132 | Rework Required Rate | 4 | AE3132 |