Actions

M407

Difference between revisions of "M407"

m (Text replacement - "{{insert title}}" to "{{this}}")
 
 
Line 20: Line 20:
 
|name=Inspect
 
|name=Inspect
 
|parent=sc:M4
 
|parent=sc:M4
|sort=340700
+
|sort=5340700
 
|level=3
 
|level=3
 
}}
 
}}

Latest revision as of 13:21, 27 October 2021

The activities associated with testing the result of the M4 process. This includes identifying the testing process, taking a sample of the material, transporting the sample or the material to the testing/inspection location, testing or inspecting the material, returning the product and recording/publishing the test results.

The outcome of the Inspect process is a quality inspection pass or fail or a return to further Examination.

Use Cases

  • In-repair testing/QC
  • Inspection of work completed at the previous station on a remanufacturing line
  • Sample testing in staging area
  • End of repair final inspections/QC

For more complex use cases this may include multiple iterations of M404 - Issue Materials - M406 - Inspect. Orders Defect Free Ratio Make Cycle Time Days of WIP Inventory Work-in-Process Inventory - Restricted Work-in-Process Quality Control Return

Hierarchy

IDNameLevelx
M4Re-Make2M4
M407Inspect3M407

Metric(s)

IDNameLevelx
DP12Orders Defect Free Ratio2DP12
RS13Make Cycle Time2RS13
AE122Days of WIP Inventory3AE122
AE1222Work-in-Process Inventory - Restricted4AE1222

Term(s)

IDNameClearx
QCQuality ControlQC
RL3Quality Control ReturnRL3
WIPWork-in-ProcessWIP

Workflow

FromInput(s)
Process
Output(s)To
M407
Note: Common inputs and outputs are listed in alphabetical order. Other inputs and outputs may be required to support varying use cases.Inspect Re-Make 5340700 3 {{{keywords}}} {{{description}}}