m (Text replacement - "Discuss Contract Custom Solution" to "Discuss Contract Custom Solution") |
|||
Line 6: | Line 6: | ||
<ins> | <ins> | ||
[[Link::m:RS14]] | [[Link::m:RS14]] | ||
− | [[Link::t: | + | [[Link::t:S2P]] |
[[Link::t:WHSE]] | [[Link::t:WHSE]] | ||
</ins> | </ins> |
The activities associated with the handling and movement of product (materials, semi-finished product, goods, merchandize) to a storage location. This includes determining the optimal storage location, assigning equipment and operators and recording the associated inventory transactions.
Storage of Engineer-to-Order materials may require special instructions and/or storage locations.
This process is complete when the product has been deposited in an inventory location. If multiple movements are required then each of these movements are a unique instance of the Put Away process. Generally, moving product to on/near production line storage is considered part of Transfer and Make. For such use cases the put away may consist of a notification only (ready for transfer). Sourcing Cycle Time Source-to-Pay Warehouse
| Process |
| ||||
---|---|---|---|---|---|---|
S307 | ||||||