The activities associated with the arrival and acceptance of the vehicle. This includes processing identification of the vehicle, verification of paperwork, weighing in, providing directions to the unloading area, assigning a position in the unloading queue and parking the vehicle/container/rail car to await unloading to commence.
Use Cases
Notes
Receive may include initial visual inspection of the vehicle and verification of paperwork and delivery slots. As a result, in some use cases, deliveries may be rejected as part of the Receive process: Oversized vehicle, risk of contamination, overweight loads, missing paperwork, missed delivery slot (i.e. too late). These types of inspection are not product, goods or merchandize related as described in S104.
Generally the costs to Receive and S103 are part of CO11. For a distribution network the costs of these processes may be classified as CO12.
Demurrage and Detention
Defective On Arrival
Sourcing Cycle Time
Cost of Goods Sold
Distribution Costs
Direct Material Costs
Source-to-Pay
Bill of Lading
Goods Receipt
Commercial Return
Workflow
Note: Common inputs and outputs are listed in alphabetical order. Other inputs and outputs may be required to support varying use cases.Receive Source-to-Replenish 210200 3 Source, Receiving, Inbound, Logistics, Weigh-in The arrival, paperwork verification and acceptance of a vehicle attempting to deliver goods to a facility