Line 6: | Line 6: | ||
# [[Link::t:ETO]] or Project supply chains are requirement driven and typically include [[sc:D3|D3]], [[sc:M3|M3]], and [[sc:S3|S3]] processes and may include some [[t:MTS]] or [[t:MTO|Make-to-Order]] processes. | # [[Link::t:ETO]] or Project supply chains are requirement driven and typically include [[sc:D3|D3]], [[sc:M3|M3]], and [[sc:S3|S3]] processes and may include some [[t:MTS]] or [[t:MTO|Make-to-Order]] processes. | ||
# [[Link::t:RL]] supply chains are event driven and include [[sc:D4|D4]], [[sc:M4|M4]], and [[sc:S4|S4]] processes and may link to [[t:MTS]] or [[t:MTO]] processes. | # [[Link::t:RL]] supply chains are event driven and include [[sc:D4|D4]], [[sc:M4|M4]], and [[sc:S4|S4]] processes and may link to [[t:MTS]] or [[t:MTO]] processes. | ||
+ | # [[Link::t:CE]] supply chains are organized to optimize the continuous utilization of resources. Once introduced into such businesses the use of these resources is extended, shared, repurposed and renewed continuously. | ||
Typically the elected {{this}} for a specific supply chain describes the front-end (customer facing side) of the supply chain. A supply chain may consist of a blend of strategies, however with the intent to achieve the goals and benefits of the {{this}} elected for the supply chain. | Typically the elected {{this}} for a specific supply chain describes the front-end (customer facing side) of the supply chain. A supply chain may consist of a blend of strategies, however with the intent to achieve the goals and benefits of the {{this}} elected for the supply chain. | ||
[[Category:Term]][[Category:Supply Chain]] | [[Category:Term]][[Category:Supply Chain]] | ||
Line 13: | Line 14: | ||
|level=1 | |level=1 | ||
|keywords=Supply, Chain, Configuration, Strategy, Make-to-Stock, Make-to-Order, Engineer-to-Order, Reverse Logistics, Supply Chain | |keywords=Supply, Chain, Configuration, Strategy, Make-to-Stock, Make-to-Order, Engineer-to-Order, Reverse Logistics, Supply Chain | ||
− | |description=The supply chain | + | |description=The supply chain configurati.on strategy which uses forecasts, planning or planning derived information to drive execution processes in lieu of customer order |
}} | }} |
A Supply Chain Configuration Strategy is how a business organizes a supply chain network and processes to achieve its goals and benefits. Businesses elect a Supply Chain Configuration Strategy for each supply chain as part of the creation and management of unique supply chain networks. (See Supply Chain Management (Align Network) processes for more information).
OpenReference has defined 4 key Supply Chain Configuration Strategies to standardize communication and practices sharing.
Typically the elected Supply Chain Configuration Strategy for a specific supply chain describes the front-end (customer facing side) of the supply chain. A supply chain may consist of a blend of strategies, however with the intent to achieve the goals and benefits of the Supply Chain Configuration Strategy elected for the supply chain.
ID | Name | Level | x |
---|---|---|---|
SCCS | Supply Chain Configuration Strategy | 1 | SCCS |
MTS | Make-to-Stock | 2 | MTS |
MTO | Make-to-Order | 2 | MTO |
ETO | Engineer-to-Order | 2 | ETO |
RL | Reverse Logistics | 2 | RL |
CE | Circular Economics | 2 | CE |
AAS | Subscription Economy | 2 | AAS |